Theatre interior.
Distorted framework forms a transparent ceiling with considerable slopes providing evacuation of rain water and melting snow. The water is evacuated through pipes inside the framework columns.
Thereby we have a high and light volume of public space.
Theatre interior.
6th OISTAT Theatre Architecture Competition.
1999, 2003.
Thereby we have a high and light volume of public space.
Theatre interior.
6th OISTAT Theatre Architecture Competition.
1999, 2003.
